{
  "specVersion": "1.0",
  "host": {
    "displayName": "exascale.build",
    "documentationUrl": "https://exascale.build/docs",
    "logoUrl": "https://exascale.build/icon.png"
  },
  "entries": [
    {
      "identifier": "urn:ai:exascale.build:server:power",
      "displayName": "Exascale Power Data (MCP)",
      "type": "application/mcp-server-card+json",
      "url": "https://api.exascale.build/.well-known/mcp.json",
      "description": "US ISO interconnection queues and cited energy data over MCP. 25 free queries, then $49/mo or $490/yr. Power: generator capacity, generator ownership, net generation, raw fuel receipts and delivered costs, as-filed FERC Form 1 plant costs, EIA Henry Hub and state electric-power natural-gas prices, hourly demand, retail sales, capacity factor, interconnection queues across all seven US ISOs/RTOs (MISO, PJM, CAISO, NYISO, ISO-NE, ERCOT, SPP), ERCOT day-ahead wholesale prices, PJM ELCC class ratings, PJM RPM capacity-market results, MISO capacity accreditation, and MISO PRA capacity-market results. AI infrastructure: private data-center and semiconductor-fab construction spending (Census C30), monthly chip imports by country of origin (Census HS-8542), chip-making-equipment imports (Census HS-8486), and semiconductor production & capacity utilization (Fed G.17). Robotics: monthly industrial-robot imports in dollars and robot counts by country of origin (Census HS-10), plus robotics ADOPTION, worker exposure, and capital expenditure (Census Industrial Robotic Equipment survey). Space: FCC satellite licensing filings, applicants, callsigns, status, and lifecycle dates, plus the FCC's weekly satellite public notices (applications accepted and actions taken since mid-2025). Every value carries a citation that hash-verifies back to the raw government source cell. Call list_capabilities_v1 first.",
      "capabilities": [
        "power_capacity",
        "power_asset_ownership",
        "power_generation",
        "power_fuel_cost",
        "power_plant_costs",
        "natural_gas_prices",
        "power_demand",
        "power_demand_rollup",
        "power_retail_sales",
        "power_capacity_factor",
        "power_interconnection_queue",
        "power_interconnection_queue_pjm",
        "power_interconnection_queue_pjm_cycle",
        "power_interconnection_queue_caiso",
        "power_interconnection_queue_nyiso",
        "power_interconnection_queue_isone",
        "power_interconnection_queue_ercot",
        "power_interconnection_queue_spp",
        "power_price_ercot",
        "power_capacity_accreditation_pjm",
        "power_capacity_market_pjm",
        "power_capacity_accreditation_miso",
        "power_capacity_market_miso",
        "ai_infrastructure_construction",
        "ai_infrastructure_trade",
        "ai_infrastructure_equipment_trade",
        "ai_infrastructure_production",
        "robotics_trade",
        "robotics_adoption",
        "space_satellite_filings",
        "space_satellite_notices"
      ],
      "representativeQueries": [
        "how much solar capacity does California have",
        "what was ERCOT peak demand last summer",
        "natural gas net generation in Texas in 2023",
        "how much capacity is in the ERCOT interconnection queue",
        "what was the ERCOT day-ahead price at the North hub yesterday"
      ],
      "version": "v1"
    },
    {
      "identifier": "urn:ai:exascale.build:agent:exascale",
      "displayName": "Exascale OSINT Agent (A2A)",
      "type": "application/a2a-agent-card+json",
      "url": "https://api.exascale.build/.well-known/agent.json",
      "description": "US ISO interconnection queues and cited energy data. 25 free queries, then $49/mo or $490/yr. Agent card for the MCP and REST surface.",
      "representativeQueries": [
        "what US power data can you verify with citations",
        "connect me to a source-cited energy data service"
      ]
    }
  ]
}
